N536XJ
Registered owner: BANK OF UTAH TRUSTEE, UT (owner ≠ operator)
Operators of this aircraft
Who operated this tail, and how firmly we know it.
| Operator | Role | Period | Basis |
|---|---|---|---|
| XOJET Aviation LLC (AWKA) | Certificate holder | — | Matched by certificate designator |
Accident & incident history
No NTSB accidents or incidents on file for this aircraft.
Maintenance disclosures
Service Difficulty Reports filed with the FAA for this airframe. Filing is largely voluntary — the number of reports is not a measure of reliability. To verify a report, search its control number at the FAA SDRS site.
21 reports on file, 2000-10-04 – 2023-09-01.
Part: PSEU — INOPERATIVE (UNKNOWN) · airframe 17,822 hrs · 9,277 cycles
AMBER WOW FAIL AND CYAN PROX SYS FAULT IN FLIGHT. MX C/A: R&R PSEU, OPS CK GOOD.
Earlier reports · 2000–2020 · 20 reports
2020
Part: WARNING MESSAGE — FALSE ACTIVATION (TE FLAPS) · airframe 15,922 hrs · 8,425 cycles
WHILE ENROUTE TO DCA, FLIGHT CREW RECEIVED AN AMBER FLAPS FAIL CAS MESSAGE. AFTER CONSULTING WITH MX CONTROL, THEY ELECTED TO CONTINUE TO DCA. CREW DECLARED AN EMERGENCY WITH APPROACH, AND LANDED UNEVENTFULLY. ONCE ON THE GROUND, CREW REBOOTED THE AIRCRAFT AND FUNCTION TESTED THE FLAPS, NO FLAP FAIL MESSAGE POSTED, AN INFO ONLY WRITE UP WAS ENTERED. AIRCRAFT WAS RETURNED TO SERVICE.
2006
Part: CONTROLLER — MALFUNCTIONED (CABIN PRESSURE) · airframe 13,827 hrs · 12,978 cycles
INFLIGHT WHITE PRESS LIGHT AND ORANGE UP CAPTION LIGHTS CAME ON. BOTH DIGITAL GAUGES HAD ERRONEOUS DISPLAYS. PERFORMED QRH AND TALKED WITH MX AND DISPATCH RETURNED TO MSP. REPLACED CABIN PRESSURE CONTROLLER, P/N 3040A000-004, S/N ON 0012 S/N OFF 00068.
Part: BATTERY PACK — NO TEST (EMERGENCY LIGHT) · airframe 13,717 hrs · 12,864 cycles
FAILED CAP CHECK. REPLACED BATTERY PACK.
Part: TRANSCEIVER — FAILED (WX RADAR SYS) · airframe 13,677 hrs · 12,815 cycles
RADAR TESTED FINE PRIOR TO DEPARTURE DURING FLIGHT DISPLAY FILLED WITH A CONCENTRIC CIRCLE OF LEVEL 1+2 RETURNS VERY SOLID ALONG THE 40+60+80 MILE ARCSTILT FULLY UP 15 DEGREES STILL HAD RETURN TRIED POWER CYCLE DIFFERENT MODES LOWERING GAIN WOULD CAUSE RETURN TO DIMINISH HOWEVER WITH GAIN IN HIGH OR AUTOPOSITION FULL SCREEN OF RETURNS WOULD APPEAR DURING BANK TO DTW RETURNS BECAME JUST SPECS NOT SOLID AND RADAR BEGAN TO START TO OPERATE NORMALLY. EVEN THOUGH RADAR STARTED TO WORK MORE NORMAL THESE WERE STILL SPECS OF LEVEL 1 RETURNS THROUGHOUT DISPLAY EVEN WITH TILT FULL UP DURING WORST PART OF HEAVY RETURNS UNIT WOULD NOT PAINT ANY RETURNS WITHIN ITS RANGE. TESTED WX RADAR TILT FUNCTIONS. ALL CHECKS GOOD. REM
Part: LANDING GEAR — OUT OF ADJUST (LEFT) · airframe 13,580 hrs · 12,711 cycles
LEFT INTRANSIT LIGHT ILLUMINATED ON DEPARTURE AND STAYED ON. CYCLED GEAR, SAME PROBLEM. THE CREW FELT THE GEAR RETRACT AND STOW. RETURNED TO MSP. ADJUSTED LEFT AFT GEAR. FIXED FAIRING AND SWUNG GEAR TIMES.
Part: ANTI-SKID SYS — MALFUNCTIONED (LANDING GEAR) · airframe 13,462 hrs · 12,614 cycles
AFTER TAKEOFF OUT OF MSP AND GEAR RETRACTION, THE ANTI SKID INOP CAUTION LIGHT ILLUMINATED. CREW FOLLOWED QRH AND SWITCHED TO GREEN SYSTEM. LIGHT WENT OUT. PERFORMED TEST OF ANTI SKID CONTROL BOX AND VALVES IAW AMM. NO FAULTS NOTED. COULD NOT DUPLICATE PROBLEM.
2005
Part: VALVE — DEFECTIVE (A/C PACK) · airframe 10,434 hrs · 10,082 cycles
FLIGHT DID AIR RETURN AFTER EXPERIENCING A REAR BAY HIGH TEMP IN FLIGHT. REMOVED AND REPLACED NR 2 PACK VALVE.
Part: BATTERY PACK — INOPERATIVE (EMERGENCY LIGHT) · airframe 9,976 hrs · 9,704 cycles
BATTERY PACK P/N 61-2275-1, S/N 9912232 FAILED SCHEDULED CAPACITY CHECK. REPLACED BATTERY ASSEMBLY P/N 61-2274-1. UNIT PASSES CMM CHECKS, RTS 2/8/05.
Part: BATTERY PACK — FAILED (EMERGENCY LIGHT) · airframe 9,976 hrs · 9,704 cycles
BATTERY PACK P/N 61-2275-1, S/N 9805512. FAILED SCHEDULED CAPACITY CHECK. REPLACED BATTERY ASSEMBLY P/N 61-2274-1. UNIT PASSES CMM CHECKS, RTS 2/8/05.
2004
Part: WIRE HARNESS — DAMAGED (HMU) · airframe 9,222 hrs · 9,066 cycles
NR 2 ENGINE EGT GAUGE ERRATIC. AIRCRAFT RETURNED TO MSP AFTER TAKEOFF DUE TO THE NR 2 ENGINE EGT FLUCTUATING -0- TO NORMAL. MAINTENANCE INSTALLED NR 2 ENGINE ECU-HMU HARNESS ASSEMBLY BY PIGGY BACKING IN SERVICEABLE HARNESS, OPS CHECKS GOOD. TEMPORARILY INSTALLED NR 2 ENGINE ECU/HMU HARNESS ASSY. PERMANENTLY INSTALL HARNESS P/N 2-303-912-02 AT NEXT MX CONVENIENCE OR NEXT NR 2 ENGINE CHANGE.
Part: ECU — FLUCTUATES (NR 2 ENGINE) · airframe 9,213 hrs · 9,057 cycles
NR 2 ENGINE EGT ERRATIC FLUCUATES -50C TO 603C T/O. AIR RETURN TO DTW. MAINTENANCE REPLACED NR 2 ENGINE ECU IAW MM 77, OPS CHECK GOOD IAW MM P/N ON & OFF 2-303-493-06, S/N ON 7ALG570, S/N OFF 3AGT92 & THERMOCOUPLE HARNESS P/N ON & OFF 2-310-089-02 IAW AMM 77-00-00 PG BLOCK 501.
Part: PUMP — FAILED (HYD SYSTEM) · airframe 9,139 hrs · 8,995 cycles
GREEN SYS HYD HI TEMP LIGHT ILLUMINATED ON FLIGHT PERFORMED QRH, NOTIFIED DISPATCH AND MAINTENANCE CONTROL AND RETURNED TO MSP. MAINTENANCE T/S AND SUSPECT NR 3 EDP P/N 521449, S/N OFF F9727550, S/N ON F1217006ACH, IAW AMM 29-10-17, 201 OPS AND LEAK CHECK GOOD.
Part: BATTERY PACK — DISCHARGED (EMERGENCY LIGHT) · airframe 9,082 hrs · 8,952 cycles
BATTERY PACK WAS REMOVED FOR SCHEDULED CAPACITY CHECK. MAINTENANCE REPLACED BATTERY CELL PACK P/N 61-2274-1. UNIT PASSES CMM TESTS. A/C RETURNED TO SERVICE 9/21/04.
Part: SEAL — LEAKING (EDP SHAFT) · airframe 9,021 hrs · 8,912 cycles
ON CLIMBOUT NOTICED OIL QUANTITY 0 AND OIL PRESSURE FLUCUATION ON RETURN TO MSP OIL PRESSURE DROPPED BELOW 50 PSI , ENGINE WAS SHUTDOWN AND SECURED PER QRH. MAINTENANCE FOUND NR 2 ENGINE EDP SHAFT SEAL BAD. REPLACED SEAL IAW 29-10-17 201, ALL CHECKS, OPS AND LEAK GOOD. NOTE 8.75 QTS OIL ADDED.
Part: PUMP — FAILED (HYD SYSTEM)
DURING FLIGHT 3489, GREEN SYSTEM HI TEMP LIGHT ILLUMINATED. GREEN HI TEMP CAME ON AT CRUISE PER QRH TURNED OFF THE PUMP HI TEMP LIGHT TURNED OFF AFTER 3 TO 4 MINUTES. AIR RETURN TO MSP. MAINTENANCE REMOVED & REPLACED NR 3 EDP P/N 521449, S/N OFF F9840491, S/N ON F9727550 IAW AMM 29-10-17, OPS AND LEAK CHECKS GOOD REF 409 194685 FOR DETAILS.
2003
Part: PTU — OVERTEMP (HYD SYSTEM)
DURING FLIGHT 3443, YELLOW SYSTEM HI TEMP INFLIGHT. A/C DIVERTED TO DENVER. MAINTENANCE REPLACED PTU. NO OTHER INFORMATION AT THIS TIME.
Part: LINE — CONTAMINATED (NR 4 ENGINE)
INTAKE LOW PRESSURE LIGHTS ILLUMINATED ON NR 3 AND NR 4 ENGINES ON TAKEOFF OF FLIGHT 3589. ABORTED TAKEOFF. MAINTENANCE PERFORMED TROUBLESHOOTING OF NR 4 ENGINE INTAKE LOW PRESSURE LIGHT IAW MM 30 FOUND NR 4 ENGINE PRESS REF LINE CONTAMINATED. REMOVED, CLEANED AND REINSTALLED LINE IAW MM. PERFORMED OPS CHECKS IAW MM, ALL CHECKS GOOD.
Part: PUMP — FAILED (HYD SYSTEM)
DURING FLIGHT 3478, DURING CRUISE AT 29000 FT THE YELLOW HYD HIGH TEMP LIGHT ILLUMINATED. FOLLOWED THE QRH AND SOME TIME AFTER TURNED OFF THE NR 2 ENG PUMP AC PUMP, AND THE PTU, THE HIGH TEMP ANNUNCIATOR WENT OUT. AIR RETURN TO DTW. MAINTENANCE REMOVED AND REPLACED NR 2 EDP IAW RJ85 MM 29-10-17. P/N ON OFF 521449, S/N ON F9717007, S/N OFF GOO1OO70. RAN SYSTEM FOR APPROX 1 HOUR, NO FAULTS NOTED. ALL CHECKS GOOD AT THIS TIME.
2002
Part: O-RING — FAILED (HYD SYSTEM) · airframe 4,083 hrs · 4,309 cycles
DURING FLIGHT 3512, GREEN HYDRAULIC SYSTEM FAILURE INDICATION. EMERGENCY DECLARED. CREW MADE AN EMERGENCY LANDING. HYDRAULIC QTY ANNUNCIATOR ON GREEN SYSTEM INDICATED 1/4, QRH PERFORMED EMERGENCY LANDING. MAINTENANCE REMOVED AND REPLACED O-RING, SERVICED HYDRAULICS, AND REPLACED EDP. ALL CHECKS GOOD.
2000
Part: BATTERY PACK — INOPERATIVE (ROW 2 - 5)
EMERGENCY FLOOR TRACK LIGHTING FROM ROW 2 TO 5 OUT. MAINTENANCE REPLACED BOTTOM PACK AT FORWARD OVERHEAD IAW AVRO AMM 33-50-00. ALL CHECKS GOOD AT THIS TIME.