N541LN
Operators of this aircraft
Who operated this tail, and how firmly we know it.
No operator established for this aircraft.
Accident & incident history
No NTSB accidents or incidents on file for this aircraft.
Maintenance disclosures
Service Difficulty Reports filed with the FAA for this airframe. Filing is largely voluntary — the number of reports is not a measure of reliability. To verify a report, search its control number at the FAA SDRS site.
4 reports on file, 2009-12-11 – 2017-10-05.
Part: STEP — CORRODED (FUSELAGE) · corrosion level 2 · airframe 6,940 hrs · 15,307 cycles
CORROSION WAS DETECTED AROUND THE PERIMETER OF THE LEFT SIDE MAINTENANCE STEP IN THE FUSELAGE.
Part: UNKNOWN — ODOR · airframe 6,524 hrs
INSPECTED ALL AIR CONDITIONER ELECTRICAL BLOWERS, MEDICAL EQUIPMENT, CHARGING BANKS, PELICAN RACK, AND ACCESSIBLE ELECTRICAL COMPONENTS, AS WELL AS RAN AIRCRAFT FOR A FULL 15 MINUTES WITH AIR CONDITIONER ON HIGH AND ALL ELECTRICAL EQUIPMENT PLUGGED IN AND ALL INTERIOR LIGHTS ILLUMINATED AND COULD NOT DUPLICATE SMELL.
Part: SKIN — CORRODED (BS 5116-5200) · airframe 3,236 hrs · 7,429 cycles
DURING INSPECTION OF ACFT, CORROSION WAS FOUND UNDER THE GROUND POINT ON THE LT SIDE OF THE FUSELAGE. GROUND POINT WAS REPAIRED IAW RDAS-AE11-0179 AND FAA FORM 8110-3 APPROVED DERT-750020-SW. FABRICATED A FILLER USING 0.20" THICK 2024-T3 ALUMINUM ALLOY. FRABRICATED A DOUBLER USING 0.32" THICK 2024-T3 ALUMINUM ALLOY. POSITIONED DOUBLER AND MATCH DRILLED EXISTING FASTENER HOLES, PILOT DRILLED FOR ADDED FASTENERS. REMOVED DOUBLER AND DE-BURRED, CLEANED, ALODINED AND EPOXY PRIMED ALL BARE ALUMINUM. COATED FRAYING SURFACES OF THE DOUBLER AND ACFT WITH SEALANT AND USING MS20470AD4 FASTENERS IN ALL EXISTING AND NEW LOCATIONS.
Part: CABLE — CORRODED (EMERGENCY FLOAT) · airframe 1,643 hrs · 3,963 cycles
DURING 18 MONTH INSP OF EMERGENCY FLOAT SYS, FOUND CABLE FOR ACTUATING DEPLOYMENT OF FLOATS CORRODED COMPLETELY THRU. CABLE FOR FLOAT SYS IS PART OF STC NR SR01855LA. SYS WAS INSTALLED ON ACFT 08 MAY 2008. MECHANICS INSTALLING REPLACEMENT CABLE WILL INSTALL WITH CPC AND DROPPING INSP TO 6 MONTHS FOR NOW.