N566NN
Registered owner: AMERICAN AIRLINES INC, TX (owner ≠ operator)
Operators of this aircraft
Who operated this tail, and how firmly we know it.
No operator established for this aircraft.
Accident & incident history
No NTSB accidents or incidents on file for this aircraft.
Maintenance disclosures
Service Difficulty Reports filed with the FAA for this airframe. Filing is largely voluntary — the number of reports is not a measure of reliability. To verify a report, search its control number at the FAA SDRS site.
84 reports on file, 2017-03-09 – 2026-10-27.
Part: ARMING SWITCH — DEFECTIVE (STEERING SYS) · airframe 26,255 hrs · 22,965 cycles
STEERING INOP CAUTION MSG IN ROUTE (AFTER GEAR RETRACTION) QRH PROCEDURE UNSUCCESSFUL. FOUND B1 007461. T/S PER FIM 32-51-37-810-A01. REMOVED AND REPLACED STEERING ARMING SWITCH IAW AMM 32-51-37-000/400-8001-A01. OPS TEST GOOD. PERFORMED NLG EXTENSION AND RETRACTION IAW AMM 32-30-00-865-802-A01. OPS CHECK GOOD STEERING INOP DID NOT REOCCUR
Part: FITTING — CORRODED (ZONE 900) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION FLOOR FITTING IN UNDER WASTE CONTAINER ON FWD LAV (1EA). NEW FLOOR FITTING P/N: A414252-3 IN UNDER WASTE CONTAINER ON FWD LAV WAS REPLACED PER SAFRAN CMM 25-40-40
Part: BUSHING — WORN (ZONE 600) · airframe 26,164 hrs · 22,890 cycles
IN REFERENCE TO TRFKE00BN3TF: FABRICATE OVERSIZE BUSHING (3EAS) ON HINGE FITTINGS R1, R2 AND R6 AT AILERON RT. OVERSIZE BUSHING (3EAS) ON HINGE FITTINGS R1, R2 AND R6 AT AILERON RH WERE FABRICATED PER REO 670-57-61-237 REV -.
Part: BEARING — CORRODED (ZONE 600) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
AFTER REMOVAL BUSHINGS AND BEARINGS ON AILERON RH IN REF TRFKEOOBN3TF CORROSION WAS FOUND ON CENTER HIGUE FITTING R5 AND R6. CENTER HINGE FITTING R6 WAS CLEANED PER SRM 51-26-00-001-001-A01 THEN INSPECTIONED PER NDT MANUAL 51-20-009-210 CONFIG A01 AND NOT DAMAGE WAS FOUND. CENTER HINGE FITTING R5 WAS REPAIRED PER REO 670-57-61-237 REV -.
Part: CLAMP — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON SUPPORT BLOCK CLAMP BTW FS=295 TO 310, STGR=25R AT E/E. SUPPORT BLOCK CLAMP BTW FS=295 TO 310, STGR=25R AT E/E WAS REPLACED PER CRJ-900 SRM 51-42-06-001-001-A01 AND CRJ-900 SRM 51-42-21-001-001-A01
Part: FLOORBEAM — CORRODED (ZONE 200) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON FLOORBEAM AT FS280 AND STGR 25RH ON INTERNAL FUSELAGE. FLOOR POST AT FS280 AND STGR 25RH ON INTERNAL FUSELAGE. WAS REPLACED PER CRJ-900 SRM 51-40-11-001-001-A01, CRJ900 SRM 51-42-06-001-001-A01, CRJ900 SRM 51-42-21-001-001-A01, CRJ-900 SRM 51-42-13-001-001-A01 AND CRJ-900 SRM 51-42-10-001-001-A01
Part: SEAT TRACK — CORRODED (ZONE 200) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON SEAT TRACK LBL=9.0 BTW FS=379 TO FS=669 AT CPAX. CORROSION ON SEAT TRACK LBL=9.0 BTW FS=379 TO FS=669 AT CPAX. WAS EVALUATED PER SRM 53-21-49-101-001-A01 AND SRM 53-31-49-101-001-A02 AND REPLACED PER AMM 53-00-49 (CONFIG A12).
Part: SEAT TRACK — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON SEAT RAIL RBL=9.0 BTW FS=379 TO FS=669. SEAT TRACK RBL=9.0 BTW BS 379 - 669 AT CPAX WERE EVALUATED OUT OF LIMITS IAW SRM 53-21-49-101-001-A01, AND SRM 53-31-49-101-001-A02, AND REPLACED IAW AMM 53-00-49 (CONFIG A12).
Part: FITTING — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON FITTING BTW FS 286 RBL=36. THE FITTING WAS EVALUATED OUT OFF LIMITS PER SRM 53-00-00-101-001-A01 AND REPLACED IAW SRM 51-42-21-001-001-A01.
Part: SEAT TRACK — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON SEAT TRACK LBL=27.0 BTW FS=379 TO FS=669 AT CPAX. SEAT TRACK LBL=27.0 BTW FS=379 TO FS=669 AT CPAX WERE EVALUATED OUT OF LIMITS PER SRM 53-21-49-101-001-A01 AND SRM 53-31-49-101-001-A02 AND REPLACED PER AMM 53-00-49 (CONFIG A12).
Part: FLOORBEAM — DAMAGED (ZONE 200) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CRACK ON BOTH ANGLE SUPPORT OF FLOORBEAM BTW FS280 RBL=10. BOTH ANGLE SUPPORT OF FLOORBEAM WERE REPAIRED IAW REO 690-53-11-1677 REV -.
Part: SEAT TRACK — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON RH SIDE SEAT TRACK BTW FS=409 TO FS=469, FS=470 TO FS=565, FS=566 TO FS=693, FS=744 TO FS=761 AND FS=785 TO FS=977 AT CPAX. RH SIDE RAIL BTW FS=409 TO FS=469, FS=470 TO FS=565, FS=566 TO 669.40, FS=744 TO FS=761 AND FS=785 TO FS=977 AT CPAX WERE EVALUATED OUT OF LIMITS PER SRM 53-21-49-101-001-A01, SRM 53-31-49-101-001-A02, SRM 53-41-49-101-001-A02 & SRM 53-51-49-101-001-A02 AND REPLACED PER CRJ-900 AMM 53-00-49 (CONFIG A12). RH SIDE RAIL BTW FS=669.40 TO FS=720.85 WAS CLEANED PER CRJ 900 SRM 51-26-00-001-001-A01, DVI WAS PERFORMED AND NOT DAMAGE WAS FOUND PER NDTM 51-20-009-210 (CONFIG A01).
Part: SEAT TRACK — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON LH SIDE RAIL BTW FS=409 TO FS=469, FS=470 TO FS=565, FS=566 TO FS=693, FS=744 TO FS=761 AND FS=785 TO FS=977 AT CPAX. LT SIDE SEAT TRACK BTW FS=409 TO FS=469, FS=470 TO FS=565, FS=566 TO FS=693, FS=744 TO FS=761 AND FS=785 TO FS=977 WERE EVALUATED OUT OF LIMITS IAW SRM 53-21-49-101-001-A01, SRM 53-31-49-101-001-A02, SRM 53-41-49-101-001-A02, AND SRM 53-51-49-101-001-A02 AND REPLACED IAW AMM 53-00-49 (CONFIG A12).
Part: FLOORBEAM — CRACKED (ZONE 200) · airframe 26,164 hrs · 22,890 cycles
CRACKED FLOORBEAM AT BS 280, LBL 10. THE CROSSBEAM WAS REPAIRED IAW REO 690-53-11-1677 REV -.
Part: SUPPORT PLATE — CORRODED (ZONE 600) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION WAS FOUND AFTER REMOVAL PLATE SUPPORT RH /LH ON FITTING FLAP LT AND RT. PLATE SUPPORT RH / LH ON FITTING FLAP LH AND RH. WERE REPLACED PER CRJ900 SRM 51-42-21-001-001-A01, CRJ 900 SRM 51-40-11-001-001-A01 AND AMM 53-82-82-400-804 (CONFIG A03).
Part: SKIN PANEL — DAMAGED (ZONE 600) · airframe 26,164 hrs · 22,890 cycles
LIGHTNING STRIKE DAMAGE TO RHS WING UPPER FWD AND AFT PLANKS AT WS88 & WS128 BETWEEN STR19 AND STR20. LIGHTNING STRIKE DAMAGE TO RHS WING UPPER FWD AND AFT PLANKS AT WS88 & WS128 BETWEEN STR19 AND STR20 WAS REPAIRED PER REO 690-57-21-573 REV -.
Part: DOOR SILL — CORRODED (ZONE 100) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON LOWER SILL BTW FS310 TO FS349 AT PASSENGER DOOR SURROUND STRUCTURE. LOWER SILL BTW BS 310 TO 349 AT PASSENGER DOOR SURROUND STRUCTURE WAS EVALUATED OUT OF LIMITS PER SRM 53-21-23-101-001-A02 AND REPLACED PER SRM 51-42-06-001-001-A01.
Part: HINGE — DAMAGED (ZONE 800) · airframe 26,164 hrs · 22,890 cycles
PASSENGER DOOR SURROUND STRUCTURE - HINGE REPLACEMENT REPLACE THE PASSENGER DOOR HINGE IN ACCORDANCE WITH CRJ900 SRM TASK 53-21-23-201-007-A01. PASSENGER DOOR SURROUND STRUCTURE - HINGE WAS REPLACED PER CRJ-900 SRM 53-21-23-201-007-A01.
Part: BONDING JUMPER — CORRODED (ZONE 600) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
THE BONDING JUMPER (3EAS) BTW WS=100, WS=60 AND WS=19 APPROX CORROSION BELOW SELMENT AREA OF BONDING JUMPER WAS FOUND. SETTELMENT AREA OF BONDING JUMPER (3EAS) BTW WS=100, WS=60 AND WS=19 APPROX WAS REPAIRED PER REO 690-57-52-602 REV -.
Part: DOOR FRAME — CORRODED (ZONE 200) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
CORROSION ON MIDCAP BTW FS310 TO FS349 ON LOWER SURROUND STRUCTURE AT PASSENGER DOOR. CORROSION ON MIDCAP BTW FS310 TO FS349 ON LOWER SURROUND STRUCTURE AT PASSENGER DOOR WAS EVALUATED OUT OF LIMITS PER CRJ-900 SRM 53-21-23-101-001-A02 AND REPLACED PER CRJ900 SRM 51-41-02-001-001-A01.
Part: SKIN — DENTED (ZONE 100) · airframe 26,164 hrs · 22,890 cycles
TEMPORARY DISPOSITION FOR REWORKED DENTS TO FUSELAGE LHS FWD SKIN AT FS235.00 BETWEEN STR12L - STR13L THE SUBJECT CONDITION IS ACCEPTABLE FOR 5210 FLIGHT HOURS FROM THE TIME OF INCORPORATION OF THIS REO AT REV. "- -" AT OR WITHIN 5210 FLIGHT HOURS, PERFORM A PERMANENT REPAIR BY REPLACING THE DISCREPANT SKIN. FUSELAGE LHS FWD SKIN AT FS235.00 BETWEEN STR12L - STR13L WAS REPAIRED PER REO 690-53-11-2260 REV. - -
Part: RIB — DAMAGED (ZONE 400) · airframe 26,164 hrs · 22,890 cycles
TEMP REPAIR FOR DAMAGE TO LH PYLON UPPER CANTED RIB BETWEEN FS1069.75 - FS1088.20 THIS TEMPORARY REPAIR IS STRUCTURALLY ACCEPTABLE FOR 8000 FLIGHT HOURS FROM TIME OF INCORPORATION OF THIS REO AT REV "-" PERFORM A PERMANENT REPAIR IAW APPROVED PROCEDURES. // ENGINEERING COMMENTS: A PERMANENT REO HAS BEEN ISSUED FOR 85693 RFTS-130142 FOR THE CANTED RIB. THIS IS FOR AN IN SERVICE A/C AND HAS BEEN PROVIDED AS A PERMANENT SOLUTION FOR A TEMP REO UNDER TRFKE00BZNWL. REPAIR TO LH PYLON UPPER CANTED RIB BETWEEN BS 1069.75 - 1088.20 WAS CONSIDERED AS PERMANENT PER REO 690-54-51-047 REV -B.
Part: SKIN PANEL — DAMAGED (ZONE 600) · airframe 26,164 hrs · 22,890 cycles
LIGHTNING STRIKE DAMAGE TO WING RH UPPER FWD PLANK BETWEEN WS29.76-WS68.00 AND BETWEEN STR19R-STR21R. LIGHTNING STRIKE DAMAGE TO WING RH UPPER FWD PLANK BETWEEN WS29.76-WS68.00 AND BETWEEN STR19R-STR21R WAS REPAIRED PER 690-57-21-576 REV. - -
Part: SKIN PANEL — DENTED (ZONE 100) · airframe 26,164 hrs · 22,890 cycles
SKIN LWR BELLY PANEL FS 270.5 BETWEEN R/H STG 26 & 25 1. WITHIN 7248.62 FLIGHT HOURS FROM REV A, ACCOMPLISH A PERMANENT REPAIR AT DISCREPANT AREA IN ACCORDANCE WITH APPROVED PROCEDURES OR REPLACE PART. SKIN LWR BELLY PANEL FS 270.5 BETWEEN R/H STG 26 & 25 WAS REPAIRED PER REO 690-53-11-2257 REV --.
Part: SKIN — DAMAGED (ZONE 200) · airframe 26,164 hrs · 22,890 cycles
LIGHTNING STRIKE ON EXTERNAL FUSELAGE SKIN FS 865 AND BTW STGR 09RH TO STGR 10RH AT FUSELAGE. LIGHTNING STRIKE ON EXTERNAL FUSELAGE SKIN FS 865 AND BTW STGR 09RH TO STGR 10RH AT FUSELAGE WAS REPAIRED PER REO 690-53-51-552 REV - -.
Part: SKIN — DAMAGED (ZONE 200) · airframe 26,164 hrs · 22,890 cycles
LIGHTNING STRIKE ON EXTERNAL FUSELAGE SKIN FS 661+16 AND BTW STGR 8RH TO STGR 9RH AT FUSELAGE. LIGHTNING STRIKE ON EXTERNAL FUSELAGE SKIN FS 661+16 AND BTW STGR 8RH TO STGR 9RH AT FUSELAGE WAS REPAIRED PER CRJ 900 SRM 53-00-00-201-003-A03.
Part: SKIN — WORN (ZONE 400) · airframe 26,164 hrs · 22,890 cycles
WEAR, LATCH AREA AND MISSING SCREW UPPER FAN COWL AT ENG 1. THE LATCH AREA UPPER FAN COWL AT ENG 1 WAS REPAIRED PER 690-54-14-825 REV. -A AND SCREW UPPER FAN COWL AT ENG 1 WAS INSTALLED PER CRJ/900 AMM 71-11-01-400-801 (CONFIG A01)
Part: BUSHING — CORRODED (ZONE 500) · corrosion level 2 · airframe 26,164 hrs · 22,890 cycles
SECONDARY NRC: AFTER REMOVAL BUSHINGS AND BEARINGS ON AILERON LH IN REF TRFKE00BN353 CORROSION WAS FOUND ON HINGUE FITTING 4 UPPER SIDE, AND CENTER HIGUE FITTING L2 AND L5. HINGE FITTING 4 UPPER SIDE WAS PER SRM 51-26-00-001-001-A01 THEN INSPECTIONED PER NDT MANUAL 51-20-009-210 CONFIG A01 AND NOT DAMAGE WAS FOUND. CENTER HINGE FITTING L2 AND L5 WERE REPAIRED PER REO 670-57-61-237 REV -.
Earlier reports · 2017–2024 · 56 reports
2024
Part: MANIFOLD — FAULTED (ZONE 700) · airframe 22,184 hrs · 19,825 cycles
STEERING INOP CAUTION MSG AT ABOUT 12000 FT. / PERFORMED UN-ATE SCAN OF NWS STYSTEM IAW UN-ATE USER GUIDE. SENT RESULTS TO TECH ANALYSTS. TROUBSHOT LANDING GEAR SELECTOR VALVE IAW FIM 32-51-35-810-801(A01) PASSED WITH A READING OF 59.6OHMS. REMOVED AND REPLACED NWS MANIFOLD IAW AMM 32-51-50-000/400-801(A01). OPS CHECK GOOD. LEAK CHECK GOOD.
Part: SELECTOR VALVE — UNSERVICEABLE (ZONE 700) · airframe 21,886 hrs · 19,557 cycles
SHORTLY AFTER TAKEOFF, A STEERING INOP MESSAGE WAS RECEIVED. THE FLIGHT PROCEEDED TO CLT AND THE CREW DECLARED AN EMERGENCY ONCE THEY GOT CLOSER TO CLT. / REMOVED AND REPLACED LANDING GEAR SELECTOR VALVE IAW CRJ 900 AMM 32-32-10-000/400-801. STEERING FAULT DID NOT REPOPULATE DURING OPS TEST. OPS TEST AND LEAK CHECK GOOD AT THIS TIME.
Part: TIRE — DAMAGED (ZONE 700) · airframe 21,710 hrs · 19,392 cycles
A/C IS RTF FOR POSSIBLE TIRE DAMAGE ON TAKEOFF. / REMOVED AND REPLACED LHIB WHEEL AND TIRE ASSEMBLY IAW CRJ 900 AMM 32-41-01-000/400-801-A01-PSA. PERFORMED VISUAL CHECK OF LH MLG FOR TIRE BURST DAMAGE IAW CRJ 900 AMM 05-51-29-210-802.
Part: WINDSHIELD — CRACKED (COCKPIT) · airframe 20,497 hrs · 18,305 cycles
WINDSHIELD HEAT CAUSING ARCING AND CRACKING / REMOVED AND INSTALLED THE CA WINDSHIELD IAW CRJ 900 AMM 56-11-01-400-801-A01-PSA. OPS CHECK OF THE WINDSHIELD TEMP CONTROLLER GOOD. OPS CHECK OF THE WINDSHIELD-WIPER DRIVE ARM GOOD. LEAK CHECK GOOD. NO FURTHER DEFECTS FOUND.
Part: BUSHING — CORRODED (LT AILERON) · airframe 20,395 hrs · 18,209 cycles
AFTER REMOVAL OF LH AILERON BUSHINGS, CORROSION ON LUG BORE OF L1, L2, L5 AND L6 OF CENTER HINGE FITTINGS OF LEFT AILERON. BORE OF L1, L2, L5 AND L6 OF CENTER HINGE FITTINGS OF LEFT AILERON WERE REPAIRED PER REO 670-57-61-237, REV. -- NOTE F AND G
Part: SKIN — DAMAGED (FUSELAGE SKIN) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKES 3(EAS) ON FUSELAGE SKIN ON STGR 17 LH AND BTW FS 379 TO FS 421. FUSELAGE SKIN ON STGR 17 LH AND BTW FS 379 TO FS 421 WAS BLEND OUT PER CRJ-900 SRM 51-12-00-001-001-A01 AND WAS EVALUATED WITHIN LIMITS PER CRJ900 SRM 53-21-01-101-005-A05.
Part: CANISTER — CRACKED (LH WING) · airframe 20,395 hrs · 18,209 cycles
CRACK IN CANISTER NO.3 , STA. WS148 OF INTERNAL RH MAIN FUEL TANK. CANISTER NO.3 , STA. WS148 OF INTERNAL RH MAIN FUEL TANK WAS REPAIRED PER REO 670-57-42-577.REV.--
Part: BUSHING — CORRODED (RT AILERON) · airframe 20,395 hrs · 18,209 cycles
AFTER REMOVAL OF RH AILERON BUSHINGS, CORROSION ON LUG BORES OF R1, R2 AND R6 OF CENTER HINGE FITTING OF RIGHT AILERON. BORES OF R1, R2 AND R6 OF CENTER HINGE FITTING OF RIGHT AILERON WERE REPAIRED PER REO 670-57-61-237, REV. -- NOTE F AND G
Part: INTERCOSTAL — WORN (BS 364-379 S3R) · airframe 20,395 hrs · 18,209 cycles
WORN INTERCOSTAL LOCATED AT STRINGER 3 RH BTW FS 364.00 TO FS 379.00 AT PASSENGER COMPARTMENT INTERNAL STRUCTURE. CRJ900 SRM 53-21-03-101-004-A04, WAS FABRICATED PER DWG SH670-30202 AND WAS REPLACED PER CRJ900 SRM 51-42-06-001-001-A01
Part: FLOORBEAM — CRACKED (BS 280 LBL 12) · airframe 20,395 hrs · 18,209 cycles
CRACKED CENTER COCKPIT FLOOR BEAM LBL12 AT FS 280.00 FLOOR INTERNAL SUPPORT STRUCTURE BELOW FLIGHT COMPARTMENT. CENTER COCKPIT FLOOR BEAM LBL12 AT FS 280.00 FLOOR INTERNAL SUPPORT STRUCTURE BELOW FLIGHT COMPARTMENT WAS REPAIRED PER REO 690-53-11-1677 REV--
Part: FLOORBEAM — CRACKED (BS 280 RBL 12) · airframe 20,395 hrs · 18,209 cycles
CRACKED CENTER COCKPIT FLOOR BEAM RBL12 AT FS 280.00 FLOOR INTERNAL SUPPORT STRUCTURE BELOW FLIGHT COMPARTMENT. CENTER COCKPIT FLOOR BEAM RBL12 AT FS 280.00 FLOOR INTERNAL SUPPORT STRUCTURE BELOW FLIGHT COMPARTMENT WAS REPAIRED PER REO 690-53-11-1677 REV --
Part: RIB — CRACKED (LH WING) · airframe 20,395 hrs · 18,209 cycles
AFTER ACCESS PANEL 521BL REMOVAL TO SLAT LUBRICATION, CRACK ON MACHINED RIB LEADING EDGE SS58.41 AT LEFT WING. MACHINED RIB LEADING EDGE SS58.41 AT LEFT WING WAS REPAIRED PER REO 690-57-41-240 REV - -
Part: HINGE FITTING — EXCESS PLAY (RUDDER HINGE) · airframe 20,395 hrs · 18,209 cycles
AFTER RUDDER REMOVAL, FREE PLAY ON SELF-ALIGN SELF-LUB BEARING PLAIN ON HINGE FITTING NO. 2 AND NO. 3 AT VERTICAL STABILIZER REAR SPAR MIDDLE SECTION. (AYP). HINGE FITTINGS # 2 AND # 3 WERE REPLACED PER CRJ900 SRM 51-42-21-001-001-A01 PAR.6.C. AND PER RIL #2103 REV. B.
Part: SKIN — DENTED (RT WING TE FLAP) · airframe 20,395 hrs · 18,209 cycles
DENTS ON LOWER SKIN OF RH INBOARD FLAP FLS 15.00 TO FLS 65.5. DENTS ON LOWER SKIN OF RH INBOARD FLAP FLS 15.00 TO FLS 65.5 WERE MEASURED AND WERE EVALUATED WITHIN LIMITS PER CRJ-900 SRM 57-52-01-101-001-A01
Part: SEAT TRACK — CORRODED (BS 744-761) · airframe 20,395 hrs · 18,209 cycles
CORROSION AT SIDE SEAT RAIL OF STRG 15RH BETWEEN FS 744.15 TO FS 761.85. SIDE SEAT RAIL OF STRG 15RH BETWEEN FS 744.15 TO FS 761.85 WAS EVALUATED OUT LIMITS PER CRJ900 SRM 53-41-49-101-001-A02 AND WAS REPLACED PER CRJ900 AMM 53-00-49 (CONFIG A12)
Part: SEAT TRACK — CORRODED (BS 379-453 LBL9) · airframe 20,395 hrs · 18,209 cycles
CORROSION IN SEVERAL LOCATIONS AT SEAT RAIL LBL 9 BTW F.S.379.00 TO F.S. 453. SEAT RAIL LBL 9 BTW F.S.379.00 TO F.S. 453.00 WAS EVALUATED OUT LIMITS PER CRJ-900 SRM 53-31-49-101-001-A02 AND REPLACED PER CRJ-900 AMM 53-00-49 (CONFIG A12)
Part: SKIN — NICKED (LT WING TE FLAP) · airframe 20,395 hrs · 18,209 cycles
NICKS ON LOWER SKIN OF LH INBOARD FLAP FLS 15.00 TO FLS 65.5. NICKS ON LOWER SKIN OF LH INBOARD FLAP FLS 15.00 TO FLS 65.5 WERE BLENDED PER CRJ900 SRM 51-12-00-001-001-A01 AND WERE EVALUATED WITHIN LIMITS PER CRJ900 SRM 57-52-01-101-001-A01
Part: SEAT TRACK — CORRODED (BS 581-661) · airframe 20,395 hrs · 18,209 cycles
CORROSION ON SEAT RAILS RBL 9 STA 421 TO 501 (2E/A) AND LBL 9 STA 581 TO 661+32. SEAT RAILS RBL 9 STA 421 TO 501 (2E/A) AND LBL 9 STA 581 TO 661+32 WERE EVALUATED OUT OF LIMITS PER CRJ 900 SRM 53-21-49-101-001-A01; CRJ900 SRM 53-31-49-101-001-A02 AND WERE REPLACED PER CRJ900 AMM 53-00-49 (CONFIG A12)
Part: BRACKET — CORRODED (BS 517-661) · airframe 20,395 hrs · 18,209 cycles
CORROSION ON BRACKET MACHINED (4 EA´S) ON FLOOR STRUCTURE AT FWD CARGO COMPARTMENT BTW FS 517 TO FS 661.00+16.00 AND BTW STGR 23 RH TO 22LH. BRACKET MACHINED (4 EA´S) ON FLOOR STRUCTURE AT FWD CARGO COMPARTMENT BTW FS 517 TO FS 661.00+16.00 AND BTW STGR 23 RH TO 22LH WERE REPLACED PER CRJ900 SRM 51-42-21-001-001-A01 AND PER CRJ900 SRM 51-42-22-001-001-A01
Part: SEAT TRACK — CORRODED (BS 581-661) · airframe 20,395 hrs · 18,209 cycles
CORROSION ON SEAT RAILS RBL 9 STA 421 TO 501 (2E/A) AND LBL 9 STA 581 TO 661+32. SIDE SEAT RAIL OF STRG 15RH BTW FS 661.00 + 90 TO FS 720.85 WAS EVALUATED OUT OF LIMITS PER CRJ-900 SRM 53-41-49-101-001-A02 AND WAS REPLACED PER CRJ900 AMM 53-00-49 (CONFIG A12)
Part: SEAT TRACK — CORRODED (BS 669-720) · airframe 20,395 hrs · 18,209 cycles
CORROSION AT SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 669.40 TO FS 720.85. SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 669.40 TO FS 720.85 WAS EVALUATED OUT OF LIMITS PER CRJ-900 SRM 53-41-49-101-001-A02 AND WAS REPLACED PER CRJ900 AMM 53-00-49 (CONFIG A12)
Part: DUCT — CRACKED (FAIRING SUPPORT) · airframe 20,395 hrs · 18,209 cycles
CRACK ON AFT REFUEL DUCT MOUNTING SUPPORT BTW FS 677.00 TO FS 669.40, BTW STGR 22RH AND 21RH. CRACK ON AFT REFUEL DUCT MOUNTING SUPPORT BTW FS 677.00 TO FS 669.40, BTW STGR 22RH AND 21RH WAS REPAIRED PER REO 690-28-25-016. REV. --
Part: SKIN — CRACKED (BS 629) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE ON FUSELAGE SKIN BTW STGR 18 RH TO 19 RH AND AT FS629. LIGHTNING STRIKE ON FUSELAGE SKIN BTW STGR 18 RH TO 19 RH AND AT FS629 WAS REPAIRED PER REO 690-53-31-816 REV - -
Part: RIB — CRACKED (LH WING TR EDGE) · airframe 20,395 hrs · 18,209 cycles
CRACKED WING RIB AT FLS 168.07 AT WING TRAILING EDGE STRUCTURE OF LH WING. CRACKED WING RIB AT FLS 168.07 AT WING TRAILING EDGE STRUCTURE OF LH WING WAS REPAIRED PER REO 690-57-51-322 REV.--
Part: RIB — CRACKED (RH WING) · airframe 20,395 hrs · 18,209 cycles
AFTER ACCESS PANEL 621BR REMOVAL TO SLAT LUBRICATION, CRACK ON MACHINED RIB LEADING EDGE SS58.41 AT RIGHT WING. CRACK ON MACHINED RIB LEADING EDGE SS58.41 AT RIGHT WING WAS REPAIRED PER REO 690-57-41-240 REV - -
Part: WEB — CRACKED (ELECTRICAL BAY) · airframe 20,395 hrs · 18,209 cycles
CRACK ON ELECTRICAL BAY FLOOR WEB RIGHT SIDE (BELOW ADG SUPPORT DOUBLER) FS193.00. ELECTRICAL BAY FLOOR WEB RIGHT SIDE (BELOW ADG SUPPORT DOUBLER) FS193.00 WAS REPAIRED PER CRJ900 SRM 53-11-43-201-001-A01
Part: RIB — CRACKED (RH WING) · airframe 20,395 hrs · 18,209 cycles
CRACKED WING RIB AT FLS 168.07 AT WING TRAILING EDGE STRUCTURE OF RH WING. WING RIB AT FLS 168.07 AT WING TRAILING EDGE STRUCTURE OF RH WING WAS REPAIRED PER REO 690-57-51-323 REV.--
Part: SKIN — DAMAGED (BS 501-517) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE ON FUSELAGE SKIN BTW STGR 16 LH TO 17 LH AND BTW FS 501 TO FS 517. LIGHTNING STRIKE ON FUSELAGE SKIN BTW STGR 16 LH TO 17 LH AND BTW FS 501 TO FS 517 WAS REPAIRED PER CRJ900 SRM 53-00-00-201-003-A03
Part: SKIN — DAMAGED (BS 379) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE ON FUSELAGE SKIN ON STGR 14 RH AT FS 379. LIGHTNING STRIKE ON FUSELAGE SKIN ON STGR 14 RH AT FS 379 WAS REPAIRED PER REO 690-53-21-1726 REV. - -
Part: SKIN — DAMAGED (BS 233-248 S14) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE (2EA) ON EXTERNAL FWD FUSELAGE SKIN AREA STGR14 BTW FS248.5 - FS233.5. LIGHTNING STRIKE (2EA) ON EXTERNAL FWD FUSELAGE SKIN AREA STGR14 BTW FS248.5 - FS233.5 WAS REPAIRED PER PER CRJ-900 SRM 53-00-00-201-003-A03
Part: SKIN — DAMAGED (BS 280-264 S15) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE (1EA) ON EXTERNAL FWD FUSELAGE SKIN AREA STGR15 BTW FS280 - FS264. LIGHTNING STRIKE (1EA) ON EXTERNAL FWD FUSELAGE SKIN AREA STGR15 BTW FS280 - FS264 WAS REPAIRED PER PER CRJ-900 SRM 53-00-00-201-003-A03
Part: SKIN — DAMAGED (BS 549 S19-20R) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE ON FUSELAGE SKIN BTW STGR 19 RH TO STGR 20 RH AT FS 549. LIGHTNING STRIKE ON FUSELAGE SKIN BTW STGR 19 RH TO STGR 20 RH AT FS 549 WAS REPAIRED PER PER CRJ-900 SRM 53-00-00-201-003-A03
Part: SKIN — DAMAGED (BS 1051-1069) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE ( 1EA) ON FUSELAGE SKIN BTW STGR 14 RH TO STGR 15RH AND BTW FS 1051 TO FS 1069. LIGHTNING STRIKE ( 1EA) ON FUSELAGE SKIN BTW STGR 14 RH TO STGR 15RH AND BTW FS 1051 TO FS 1069. WAS BLEND OUT PER CRJ900 SRM 51-12-00-001-001-A01 AND WAS EVALUATED WITHIN LIMITS PER CRJ900 SRM 53-61-01-101-004-A02
Part: SKIN — DAMAGED (BS 596 S23R) · airframe 20,395 hrs · 18,209 cycles
LIGHTNING STRIKE ON FUSELAGE SKIN ON STGR 23 RH AT FS 596. LIGHTNING STRIKE ON FUSELAGE SKIN ON STGR 23 RH AT FS 596 WAS REPAIRED PER PER CRJ-900 SRM 53-00-00-201-003-A03
Part: DRAG ANGLE — CRACKED (VERTICAL STAB) · airframe 20,395 hrs · 18,209 cycles
CRACK ON RIGHT VERTICAL STABILIZER TO FUSELAGE ATTACHMENT AFT DRAG ANGLE BTW 55.625% STGR DATUM TO 67.5% REAR SPAR DATUM (TRACE AT BL0.00). AFT DRAG ANGLE BTW 55.625% STGR DATUM TO 67.5% REAR SPAR DATUM (TRACE AT BL0.00) WAS REPAIRED PER CRJ900 SRM 55-31-00-201-001-A01
Part: DRAG ANGLE — CRACKED (VERTICAL STAB) · airframe 20,395 hrs · 18,209 cycles
CRACK ON LEFT VERTICAL STABILIZER TO FUSELAGE ATTACHMENT AFT DRAG ANGLE BTW 55.625% STGR DATUM TO 67.5% REAR SPAR DATUM (TRACE AT BL0.00). AFT DRAG ANGLE BTW 55.625% STGR DATUM TO 67.5% REAR SPAR DATUM (TRACE AT BL0.00) WAS REPAIRED PER CRJ900 SRM 55-31-00-201-001-A01
Part: SKIN — SCRATCHED (BS 985-1000) · airframe 20,395 hrs · 18,209 cycles
SEVERAL SCRATCH ON EXTERNAL REAR FUSELAGE SKIN AREA BTW FS985.00 - FS1000.00 AND STGR 14 - STGR 16. FUSELAGE SKIN AREA BTW FS985.00 - FS1000.00 AND STGR 14 - STGR 16 WAS REPAIRED PER REO 690-53-61-1346 REV - -
Part: SEAT TRACK — CORRODED (BS 847-865) · airframe 20,395 hrs · 18,209 cycles
CORROSION AT SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 847.00 + 61 TO FS 865. CORROSION ON STRG 15LH BETWEEN FS 847.00 + 61 TO FS 865.00 WAS EVALUATED OUT LIMITS PER CRJ-900 SRM 53-31-49-101-001-A02 AND WAS REPLACED PER CRJ900 AMM 53-00-49 (CONF A12)
Part: SEAT TRACK — CORRODED (BS 785-797 S15L) · airframe 20,395 hrs · 18,209 cycles
CORROSION AT SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 785.15 TO FS 797. SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 785.15 TO FS 797.00 WAS EVALUATED OUT LIMITS PER CRJ900 SRM 53-41-49-101-001-A02 AND REPLACED PER CRJ-900 AMM 53-00-49 (CONFIG A12)
Part: FLOOR SUPPORT — CRACKED (BS 221-229) · airframe 20,395 hrs · 18,209 cycles
CRACK ON FLOOR BEAM RBL 12.0 BTW FS 221.73 TO FS 229.00 AT FWD FUSELAGE INTERNAL STRUCTURE (FLIGHT COMPARTMENT FLOOR STRUCTURE BELOW WL79.50). FLOOR BEAM RBL 12.0 BTW FS 221.73 TO FS 229.00 AT FWD FUSELAGE INTERNAL STRUCTURE (FLIGHT COMPARTMENT FLOOR STRUCTURE BELOW WL79.50) WAS REPAIRED PER REO 690-53-11-1680 REV. --
Part: INTERCOSTAL — CORRODED (BS 316 LBL9) · airframe 20,395 hrs · 18,209 cycles
CORROSION ON INTERCOSTAL AT FS316 BTW LBL 9 TO RBL 9. INTERCOSTAL AT FS316 BTW LBL 9 TO RBL 9 WAS REPAIRED PER REO 690-53-21-1717 REV -.
2023
Part: SEAT TRACK — CORRODED (BS 744-761 S15L) · airframe 20,395 hrs · 18,209 cycles
CORROSION AT SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 744.15 TO FS 761.85. SIDE SEAT RAIL OF STRG 15LH BETWEEN FS 744.15 TO FS 761.85 WAS EVALUATED OUT OF LIMITS PER CRJ900 SRM 53-41-49-101-001-A02 AND WAS REPLACED PER CRJ900 AMM 53-00-49 (CONFIG A12).
Part: FITTING — UNKNOWN (RH UPPER HSTA) · airframe 19,054 hrs · 17,069 cycles
NEW HSTA FITTING AV670-23105-006S MISDRILLED AND REQUIRES NEW FITTING. PERFORMED A MAJOR REPAIR TO R/H HSTA UPPER FITTING ASSY.
Part: UNKNOWN — UNKNOWN (UNKNOWN) · airframe 18,857 hrs · 16,908 cycles
DURING TAKEOFF, MESSAGE FOR NOSE WHEEL STEERING CAME UP DURING FLIGHT. TROUBLESHOT PER FIM 32-51-50-810-801. B1-007464. C/W OPS CHECK OF NWS IAW CRJ 900 AMM 32-51-00-710-801. OPS CHECK GOOD AT THIS TIME.
2020
Part: SENSOR — FAILED (BRAKE TEMP) · airframe 13,429 hrs · 12,235 cycles
AFTER TAKE OFF FROM CAK THE CREW RECEIVED A BTMS INDICATION. THEY HAD THE PASSENGERS BRACE, DECLARED AN EMERGENCY AND RETURNED TO CAK. THEY LANDED SAFELY AND WITHOUT INCIDENT. TRUCKS ROLLED. THE PASSENGERS ARE OK AND THE CREW WILL CONTINUE ON WITH THEIR FLIGHT SCHEDULE FOR THE DAY. THE AIRCRAFT IS IN MAINTENANCE AND THE 5269 HAS BEEN SWAPPED TO ANOTHER PLANE IN CAK. R & R LT OUTBOARD BRAKE TEMPERATURE SENSOR, IAW AMM 32-46-01-000/400-801. OPERATIONS CHECK GOOD.
Part: DOOR SEAL — DAMAGED (PAX DOOR) · airframe 12,756 hrs · 11,644 cycles
DURING CLIMB OUT OF PNS, AT FL200 CREW BEGAN HEARING POPPING NOISE AND BEGAN TO FEEL PRESSURE DROPPING. CREW NOTICED CABIN ALT RISING. CREW DONNED O2 MASKS, BEGAN EMERGENCY DESCENT AND DECLARED AN EMERGENCY WITH ATC. CREW RECEIVED NO WARNINGS AND CABIN ALT NEVER EXCEEDED FL140. CABIN O2 MASKS DID NOT DROP. FLIGHT DIVERTED TO MGM. INSPECTED AND FOUND PASSENGER DOOR SEAL REPAIR TO BE DAMAGED - REMOVED AND REPLACED PASSENGER DOOR SEAL, LEAK AND OPS CHECK GOOD.
Part: MEGAPHONE — INOPERATIVE (ZONE 200) · airframe 12,681 hrs · 11,577 cycles
MEGA PHONE INOP. CHANGE BATTERIES, STILL WILL NOT WORK. INSTALLED SERVICEABLE MEGAPHONE.
Part: DOUBLER — CRACKED (PAX DOOR) · airframe 12,681 hrs · 11,577 cycles
PAX DOOR,UPPER AFT CORNER DOUBLER IS CRACKED, LOCATED UNDER PANEL 832AR. REMOVED CRACKED DOUBLER. IAW CRJ900 SRM 51-42-06-001-001-A01, 51-42-21-001-001-A01. LOCATED, DRILLED, AND INSTALLED NEW DOUBLER, PN: 601R-318094-2.
Part: DOOR SILL — CORRODED (FUSELAGE) · corrosion level 2 · airframe 12,681 hrs · 11,577 cycles
RH FLOOR SILL IS CORRODED AT 2 LOCATIONS BETWEEN FS 280.00 AND FS 319.75. LOCATED, DRILLED AND INSTALLED NEW FLOOR SILL. IAW CRJ900 SRM'S 51-42-06-001-001-A01, 51-42-13-001-001-A01, 57-42-21-001-001-A01, 51-40-11-001-001-A01.
Part: FRAME — CORRODED (FUSELAGE) · corrosion level 2 · airframe 12,681 hrs · 11,577 cycles
FUSELAGE LOWER FRAME AT FS295, STGR27 IS CORRODED ON FWD SIDE. REPAIRED IAW CRJ 900 SRM 53-00-06-101-002-A04
Part: SUPPORT ANGLE — CORRODED (FUSELAGE) · corrosion level 2 · airframe 12,681 hrs · 11,577 cycles
PASSENGER DOOR CENTER FLOOR SILL SUPPORT ANGLE CORRODED AROUND NUT PLATES. REMOVED THE PAX DOOR CENTER FLOOR SILL SUPPORT ANGLE ASSY IAW CRJ900 SRM 51-42-06-001-001-A01 AND 51-42-21-001-001-A01, LOCATED, DRILLED AND INSTALLED NEW SERVICEABLE ANGLE IAW CRJ900 SRM'S 51-42-06-001-001-A01, 51-40-11-001-001-A01, 51-42-21-001-001-A01 (P/N: SH670-31875-7).
Part: INTERCOSTAL — CORRODED (FUSELAGE) · corrosion level 2 · airframe 12,681 hrs · 11,577 cycles
RH INTERCOSTALS BETWEEN FS349.00 AND FS364.00, STR26L TO STR 26R ARE CORRODED. LOCATED AND DRILLED LH AND RH INTERCOSTALS AT FS349.00 TO FS 364.00 IAW CRJ 900 SRM 51-40-11-001-001-A01.
Part: INTERCOSTAL — CORRODED (FUSELAGE) · corrosion level 2 · airframe 12,681 hrs · 11,577 cycles
LH INTERCOSTAL BETWEEN FS349.00 AND FS364.00, STR26L TO STR 26R ARE CORRODED. LOCATED AND DRILLED LH AND RH INTERCOSTALS AT FS349.00 TO FS 364.00 IAW CRJ 900 SRM 51-40-11-001-001-A01.
2019
Part: ACM — SEIZED (LEFT) · airframe 6,825 hrs · 6,291 cycles
AIRCRAFT RETURNED TO THE FIELD DUE TO SMOKE SMELL IN THE CABIN AND COCKPIT. PERFORM POWER ASSURANCE CHECK. PERFORMED OPS CHECK HPSOV. PERFORMS CHECK OF A/C DISTRIBUTION SYSTEM. NO DEFECTS NOTED AT THIS TIME. CREW REPORTED A STRONG ELECTRICAL SMELL IN GALLEY. MX INSPECTED A/C AND DEFERRED LH PACK. A LATER INSPECTION FOUND THE LH ACM TO BE SEIZED.
2018
Part: TRIM SYSTEM — ABNORMAL (STAB) · airframe 7,371 hrs · 6,739 cycles
STAB TRIM RUN AWAY IN FLIGHT, EMERGENCY WAS DECLARED. INSPECTED AND OPS CHECKED STAB TRIM SYSTEM, OPS CHECK GOOD WITH NO DEFECTS.
2017
Part: SELECTOR VALVE — FAULTY (NLG STEERING) · airframe 5,144 hrs · 4,675 cycles
STEERING INOPERABLE CAUTION MESSAGE. REMOVED AND REPLACED LANDING GEAR SELECTOR VALVE.