Accident & incident history
No NTSB accidents or incidents on file for this aircraft.
Maintenance disclosures
DURING EDDY CURRENT INSPECTION, CRACKS WHERE FOUND IN THE BENDS BETWEEN THE VERTICAL FRAME AND FRAME FLANGE ON THE LEFT AND RIGHT SIDES OF FRAME 33.
ON TAXI DURING CONTROL CHECK, AILERONS WENT INTO MANUAL REVERSION AND SYSTEM PRESS 800 PSI. ADJUSTED LT AND RT AILERON POWER BYPASS IAW DACO MM 27-5-2, OPS CHECKS GOOD.
NR 2 ENGINE COMPRESSOR STALLED AT HIGH ENGINE RPMS, HIGH FUEL FLOW NOTED. REMOVED AND REPLACED FUEL CONTROL, RAN ENGINE, TRIMMED IDLE AND PART POWER, OPS CHECKS GOOD IAW PWA 73-2-2. TRIM RUN IAW DAC MM 71-0, ALL PARAMETERS.
NR 2 ENGINE NOT PRODUCING T/O POWER, ABORTED AT 88 KNOTS. SWAPPED NR 1 AND NR 2 EPR GAUGES IAW DC-8 MM CHAPTER 77-1-0, OPS CHECKED GOOD.
AT TAKEOFF POWER 1.87 EPR ALL ENGINE BLEEDS ON, MANIFOLD AIR PRESSURE DROPPED TO ZERO. ABORTED TAKEOFF AND RETURNED TO RAMP. FOUND LOOSE FITTING ON MANIFOLD PRESSURE INDICATOR, GROUND RAN OPS CHECK OK AS PER 36-0-0.
HYDRAULIC QUANTITY LOST DURING CLIMBOUT, RETURNED TO SBGR. FOUND HYDRAULIC STANDBY RUDDER PUMP PRESSURE LINE BUSTED. REMOVED AND REPLACED LINE, OPS CHECKED GOOD IAW DC-8 M/M 29-0.
LOST PRESSURIZATION DURING CRUISE, UNABLE TO OPERATE NASI FLOW CONTROL SYSTEM. CHECKED NASI SYSTEM AND GROUND RUN, SYSTEM CHECKED GOOD IAW NASI M/M CHAPTER 21-7-0, PRESSURIZATION OK.
NR 2 POWER LEVER BINDING, ENGINE WOULD NOT DEVELOP MAX POWER. CLEANED AND LUBED THROTTLE DRUM, OPS CHECK NORMAL AT ALL POWER SETTINGS IAW 71-00.
AFTER TAKEOFF, UNABLE TO PRESSURIZE THE SYSTEM DUE FLOW CONTROL VALVES WEREN'T WORKING PROPERLY. CHECKED FLOW CONTROL VALVES, CONNECTIONS, RESEATED C/B'S AND TESTED ON GROUND OK.
SBSV-SBSV - FLT NR 10501 - TAXIING OUT FROM SBSV, NO SPOILER PRESSURE. REMOVED AND REPLACED HYDRAULIC PRESSURE LINE. CHECK GROUND OPS OK IAW MM 27-33-1. (X)
CAPTAINS ATTITUDE INDICATOR TUMBLED ON TAKEOFF ROLL. TAKEOFF ABORTED AT 90 KNOTS. REPAIRED BROKEN WIRE AT CAPTAINS ATTITUDE INDICATOR. PERFORMED HIGH SPEED TAXI, SYSTEM OPS CHECKS GOOD. (M)
LOWER AFT CARGO COMPARTMENT, 'D' ENTRANCE DOOR CENTER METAL PANEL SUPPORT HAS LEVEL 2 CORROSION AND SHEARED NUTS. MADE AND INSTALLED DOOR CENTER METAL PANEL SUPPORT. REMOVED AND REPLACED ANCHOR NUTS AS PER SRM 52-4-0. (M)
FUSELAGE AFT SECTION FS 1530, FLOOR BEAM HAS CORROSION AT 2 PLACES LEVEL 2, REQUIRES REPAIRING, 2 INCH BY 3 INCH AND 2 INCH BY 4 INCH. REPAIRED AFFECTED AREA AS REQUIRED PER SRM 53-4-0. (M)
MAIN CARGO COMPARTMENT FLOOR 5 TRACKS ARE BROKEN. REPAIRED TRACKS AS PER 52-1-0. (M)
MAIN CARGO COMPARTMENT FLOOR RT SIDE STATION 460, STATION 480 AND STATION 500, TRACK AND WEB AREA HAS CORROSION, LEVEL 2, 5 AREAS. REMOVED AND REPAIRED TRACK AS PER SRM 52-4-0. (M)
COCKPIT FLOOR FROM FS 141 THROUGH FS 245 LEFT SIDE (AROUND NR 91 ACCESS PANEL), HAS CORROSION, LEVEL 2. REMOVED CORROSION AND REPAIRED AFFECTED AREA PROPERLY AS PER SRM 52-4-0. (M)
MAIN CARGO COMPARTMENT AROUND FORWARD LAVATORY FLOOR TRACK DOUBLER HAS CORROSION, LEVEL 2, BETWEEN STATION 265 AND 275 (RT SIDE). (M)
RIGHT HORIZONTAL STABILIZER L/E INTERNAL PART RIB HAS CORROSION, LEVEL 2. REMOVED CORROSION, TREATED AREA, AND REPAIRED INTERNAL PART RIB AS NECESSARY PER SRM 55-2-3, 55-3-0. (M)
TAIL CONE, HORIZONTAL SUPPORT AND BRACKET BASE RIGHT SIDE HAS LEVEL 2 CORROSION. MADE AND INSTALLED DOUBLER AS REQUIRED PER SRM 53-2-5. (M)
MAIN CARGO COMPARTMENT, GALLEY AND FWD LAV AREA FLOOR HAS LEVEL 2 CORROSION, STATION 265 TO 295. MADE AND INSTALLED GALLEY AND FWD LAV AREA FLOOR AS PER SRM 52-4-0. (M)
AFT MAIN CARGO COMPARTMENT FS 1504 BEAM UPPER SIDE HAS CORROSION, LEVEL 2. REPAIRED AFFECTED AREA AS REQUIRED PER SRM 52-2-0. (M)
LEFT HORIZONTAL STAB L/E HAS 3 RIBS CORRODED, LEVEL 2. REPAIRED AFFECTED AREA PROPERLY AS PER SRM 55-3-0. (M)
RIGHT WING REAR SPAR CAP AT XW 69.50 HAS 2 CRACKS BETWEEN STIFFENERS, 2.5-7 INCHES. REPAIRED AFFECTED AREA AS PER SRM 57-5-0. (M)
RIGHT WING REAR SPAR CAP AT XW 69.50 HAS 2 CRACKS BETWEEN STIFFENERS, 2.5 THROUGH 7 INCHES. REPAIRED AFFECTED AREA AS PER SRM 57-5-0. REFERENCE TC8A96024.
CARGO COMPARTMENT FLOOR STATION 880 MLG UPPER SKIN DOUBLER BETWEEN STACK AND WEB IS BROKEN. REPAIRED AFFECTED AREA AS PER SRM 52-1-0. (M)
LOWER FORWARD CARGO COMPARTMENT WALL, STATION 560, BOTTOM AREA RIGHT SIDE EDGE CRACKED, 2 INCHES. AFFECTED AREA REPAIRED AS REQUIRED PER SRM 51-1-19, 52-4-0. (M)
LOWER FORWARD CARGO COMPARTMENT STATION 520 TOP SURFACE RIGHT SIDE LINING SPLICE DOUBLER CRACKED, 2 INCHES. REPAIRED DOUBLER AT AFFECTED AREA AS REQUIRED PER SRM 52-4-0. (M)
RIGHT MAIN LANDING GEAR DOOR UPPER SURFACE SKIN CRACKED, 1 INCH. REPAIRED AFFECTED AREA AS PER SRM 57-2-1. (M)
LOWER FORWARD CARGO COMPARTMENT LINING STATION 560 TOP SURFACE RIGHT SIDE AFT DOOR HOUSING HAS DOUBLER BROKEN. MADE AND INSTALLED DOUBLER AT AFFECTED AREA AS REQUIRED PER SRM 52-4-0. (M)
LOWER AFT CARGO COMPARTMENT STATION 1120 RIGHT SIDE 532R, CARGO DOOR DOUBLER IS BROKEN, ALSO CORRODED, LEVEL 2. REPAIRED AFFECTED AREA AND CCONTROLLED CORROSION AS PER SRM 52-4-0. (M)
LW T/E LOWER SURFACE XW 408.343 HAS DOUBLER BROKEN AND CRACKED (5 INCHES). MADE AND INSTALLED NEW DOUBLER AS PER SRM 57-2-3. (M)
RIGHT WING ERS 300.344, TE STEEL DOUBLER LOWER SURFACE IS BROKEN. MADE AND INSTALLED DOUBLER AT AFFECTED AREA AS REQUIRED PER SRM 57-2-3. (M)
AFT FUSELAGE STATION 1080 AND STATION 1040, RIGHT STRINGER NR 32 HAS CORROSION LEVEL 2. TREATED AND REPAIRED STRINGER 32 RT, MADE AND INSTALLED UPPER PLATE AS PER SRM 52-4-0. (M)
AFT FUSELAGE FS 1080, RIGHT STRINGER NR 34 DOUBLER HAS CORROSION, LEVEL 2. MADE AND INSTALLED NEW DOUBLER AS PER SRM 51-10-O. (M)
AFT FUSELAGE FS 1220 AND 1240, RIGHT STRINGER NR 34 HAS CORROSION, LEVEL 2. NR 34 STRINGER REPAIRED AS PER SRM 53-4-0. (M)
AFT FUSELAGE STATION 1080 AND STATION 1040, RIGHT STRINGER NR 34 DOUBLER HAS LEVEL 2 CORROSION. REPAIRED DOUBLER AS PER SRM 53-4-0. (M)
RW T/E FLAP LOWER SURFACE ACTUATOR ROD DOUBLER BROKEN, 1 INCH. MADE AND INSTALLED DOUBLER AT AFFECTED AREA AS EPR SRM 57-2-1. (M)
LEFT WING, STATION XRS 230.500 T/E LOWER PART SHOWS STRUCTURAL REPAIR WITH 4 LOOSE RIVETS AND BUCKED HEAD OVERSIZED. REPAIRED AFFECTED AREA AS REQUIRED PER SRM 57-2-1. (M)
LW T/E LOWER SURFACE XW 60.250, DOUBLER HAS A CRACK 4.5 INCH. REPLACED DOUBLER AS PER SRM 57-2-1. (M)
NR 2 MAIN TIRE MISSING AFTER LANDING YIP. FOUND OUTBOARD FLANGE BROKEN OFF. REPLACED NR 2 AND NR 1 MAIN WHEEL ASSY.