N926FM

EMBRAER EMB-135ER · 2001 · Fixed-wing multi-engine · 2 engines · 37 seats · Valid Registration

Registered owner: RVR AIR CHARTER LLC, TX (owner ≠ operator)

Operators of this aircraft

Who operated this tail, and how firmly we know it.

OperatorRolePeriodBasis
RVR AVIATION LLC (V8XA)Certificate holderMatched by certificate designator

Accident & incident history

No NTSB accidents or incidents on file for this aircraft.

Maintenance disclosures

Service Difficulty Reports filed with the FAA for this airframe. Filing is largely voluntary — the number of reports is not a measure of reliability. To verify a report, search its control number at the FAA SDRS site.

4 reports on file, 2001-08-06 – 2013-06-07.

SMOKE/FUMES/ODORS/SPARKS; WARNING INDICATION · 2013-06-07 Matched by certificate designator
ATA 3040

Part: CONTROLLER — FAILED (WINDOW HEAT) · airframe 12,027 hrs · 12,402 cycles

WINDSHIELD HEAT NR 2 FAIL MESSAGE APPEARED WHEN SELECTED ON DURING DESENT. ELECTRIC BURNING SMELL SHORTLY AFTER. FOLLOWED QRH PROCEDURES AND PERFORMED A NORMAL APPROACH AND LANDING. FOUND WINDOW HEAT CONTROLLER TO BE FAILED. PLACED WINDOW HEAT SYS ON MEL 30-42-02 AND PERFORMED SPECIAL PROCEDURES SP-30-42-02, PULLED AND SAFETIED THE WINDSHIELD TEMP CB J20. ALSO, FOUND WINDSHIELD TO BE DELAMINATED WITHIN MFG ALLOWABLE LIMITS. NO WINDSHIELD DELAMINATION NOTED WITHIN THE HEATED AREA. PLACED AOG ORDER FOR WINDOW HEAT CONTROLLER AND RT WINDSHIELD.

Source: SDR 7GMB201306070466
SMOKE/FUMES/ODORS/SPARKS · 2009-04-30 Matched by certificate designator
ATA 2520

Part: PANEL — INACTIVE (ZONE 100) · airframe 8,053 hrs · 8,352 cycles

ON CLIMB OUT, THROUGH APPROX 17,000, FLT ATTENDANT REPORTED THAT WHEN THE PC-POWER SYSTEM WAS TURNED ON, 1 PASSENGER MOMENTARILY SMELLED A FAINT ODOR, WHICH CAME & WENT QUICKLY, SMELLING LIKE ELECTRICAL SMOKE. NO OTHER PASSENGER IN THE AREA NOTED THE ODOR, NOR DID THE FLT ATTENDANT. AS A PRECAUTION, PC-POWER SYSTEM TURNED OFF. QRH PROCEDURES REVIEWED REGARDING SMOKE/ODOR IN CABIN, NO FURTHER ACTION REQUIRED. NO FURTHER ISSUES NOTED DURING FLT. MX POWERED UP ACFT ELECTRICAL SYS & OBSERVED FOR 1 HOUR. ALL INTERIOR SYS OPS NORMAL, NO ODORS NOTED. MULTIPLE OPS CHECKS OF PC-POWER SYS REVEALED SEATS 7BC DID NOT POWER UP & TEST PROPERLY. ENTIRE PC-POWER SYS PLACED ON MEL 25-60-02, PLACARDS AFFIXED & CIRCUIT BREAKERS PULLED & COLLARED. R & R ISPC IN ROW 7BC. INSPECTED WIRING & FOUND NO DEFECTS. SYS OPS FOR A TOTAL OF 1 HOUR 45 MINUTES WITH NO DEFECTS NOTED. AMM TASK 24-20-05-400-801-A SYS HAS BEEN REACTIVATED, CB RESET & PLACARDS REMOVED. CLEARED MEL 25-60-02.

Source: SDR I06B20090501FM
OTHER · 2008-10-30 Matched by certificate designator
ATA 5280

Part: DOOR — DAMAGED (NLG) · airframe 7,527 hrs · 7,874 cycles

14K FT NOTICED A FLASH OF LIGHT THAT APPEARED TO BE BELOW THE AIRCRAFT. THE CREW REPORTED NO AIRCRAFT ANOMALIES AS A RESULT OF THE SUSPECTED NEAR LIGHTNING STRIKE. FO PERFORMED THE POST FLT INSP AND IMMEDIATELY NOTICED A PIN HOLE IN THE NOSE GEAR DOOR. CAPTAIN CONFIRMED AIRCRAFT HAD BEEN STRUCK BY LIGHTNING. THE REMOVAL OF THE AILERON WAS INITIATED. THE ALTERNATIVE TO MOVE THE PART TO THE UNITED AIRLINES COMPOSITE REPAIR SHOP IN SFO WAS EXECUTED. REPAIRS WHERE MADE PER THE STRUCTURAL REPAIR MANUAL, AND AN ASG MECHANIC REMAINED IN THE AREA TO TRANSPORT THE REPAIRED PARTS TO MHR. THE AIRCRAFT HAD ALL OF THE BELLY REWORK ACCOMPLISHED DURING THE SAME TIME PERIOD. REINSTALLATION WAS ACCOMPLISHED AND THE REQUIRED INSPECTIONS COMPLETED AND SIGNED.

Source: SDR I06B20081030001
INADEQUATE Q C · 2001-08-06 Matched by certificate designator
ATA 3610

Part: CLAMP — LOOSE (BLEED AIR SYS)

DURING ADDITIONAL ACCEPTANCE INSPECTION, IT WAS AGAIN NOTED THE AIRFRAME BLEED AIR CHECK VALVE V-BAND CLAMPS WERE NOT INSTALLED CORRECTLY IAW COMMON INDUSTRY PRACTICE OR AS RECOMMENDED BY THE CLAMP MANUFACTURE.

Source: SDR CWQ2001F00000